Building Resilience in High Technology Projects: An Integrated Multi Framework Risk Management Approach

Authors

  • Ahmad Mubarok Akademi Penerbang Indonesia Banyuwangi
  • Fardan Zeda Achmadi Yuda Politeknik Penerbangan Indonesia Curug

DOI:

https://doi.org/10.61978/novatio.v3i2.860

Keywords:

High Technology Projects, Integrated Risk Management, Multi Framework Governance, Compliance Readiness, Mitigation Speed

Abstract

High-technology projects face rapidly evolving risks across technical, organizational, and regulatory domains, creating challenges that single-framework governance often cannot fully address. This study proposes an integrated multi-framework risk management approach, combining governance-level (e.g., ISO 31000), domain-specific (e.g., ISO/IEC 27005, NIST SP 800-53, NIST AI RMF), and execution-level tools (e.g., SAFe ROAM, NASA NPR 8000.4C). Unlike prior studies that apply frameworks in isolation, this research evaluates a layered integration model designed to improve risk coverage, mitigation speed, and compliance readiness. Using framework mapping, Fuzzy Multi-Criteria Decision Making (MCDM), House of Risk (HOR) analysis, and Monte Carlo simulations, the findings show that integrated governance achieves broader protection, reduces closure times for high-velocity risks, and raises audit pass rates above 90%. The novelty of this study lies in offering a practical governance blueprint that reconciles overlapping standards while tailoring protections for AI, cloud computing, and mission-critical systems. Beyond technical improvements, the model aligns organizational risk appetite with operational practices, fostering resilience and agility.

References

Abia, D. U., Nwaogazie, I. L., & Chinemerem, P. (2024). Causes of Safety Barrier Failures at Oil and Gas Facilities in Nigeria: A Technical Approach. Journal of Scientific Research and Reports, 30(8), 371–381. https://doi.org/10.9734/jsrr/2024/v30i82260 DOI: https://doi.org/10.9734/jsrr/2024/v30i82260

Achmad, F., Sriwana, I. K., & Rumanti, A. A. (2023). Supply Chain Risk Mitigation for Logistics Service Companies. Jurnal Sistem Teknik Industri, 25(2), 272–283. https://doi.org/10.32734/jsti.v25i2.11402 DOI: https://doi.org/10.32734/jsti.v25i2.11402

Akinrolabu, O., New, S., & Martin, A. (2019). CSCCRA: A Novel Quantitative Risk Assessment Model for SaaS Cloud Service Providers. Computers, 8(3), 66. https://doi.org/10.3390/computers8030066 DOI: https://doi.org/10.3390/computers8030066

Balan, S., & Handfield, R. (2024). An Integrated Supply Chain Risk Mitigation Tool—Model, Analysis, and Insights. https://doi.org/10.21203/rs.3.rs-4007171/v1 DOI: https://doi.org/10.21203/rs.3.rs-4007171/v1

Bloshchynskyi, I., МЕЙКО, О., Zalozh, V., Andrushko, V., & Войтюк, О. (2024). Methodical Apparatus for Risk Assessment in Decision-Making to Combat Illegal Migration at the State Border of Ukraine. Edelweiss Applied Science and Technology, 8(3), 14–27. https://doi.org/10.55214/25768484.v8i3.1089 DOI: https://doi.org/10.55214/25768484.v8i3.1089

Boateng, P., Chen, Z., & Ogunlana, S. O. (2020). A Dynamic Framework for Managing the Complexities of Risks in Megaprojects. International Journal of Technology and Management Research, 1(5), 1–13. https://doi.org/10.47127/ijtmr.v1i5.38 DOI: https://doi.org/10.47127/ijtmr.v1i5.38

Brandis, K., Dzombeta, S., Colomo‐Palacios, R., & Stantchev, V. (2019). Governance, Risk, and Compliance in Cloud Scenarios. Applied Sciences, 9(2), 320. https://doi.org/10.3390/app9020320 DOI: https://doi.org/10.3390/app9020320

Cook, M., & Mo, J. P. (2019). Lifecycle Risk Modelling of Complex Projects. https://doi.org/10.5772/intechopen.82273 DOI: https://doi.org/10.5772/intechopen.82273

Dahmen, P. (2023). Organizational Resilience as a Key Property of Enterprise Risk Management in Response to Novel and Severe Crisis Events. Risk Management and Insurance Review, 26(2), 203–245. https://doi.org/10.1111/rmir.12245 DOI: https://doi.org/10.1111/rmir.12245

de, G. S. M., Bark, R. H., & Arellano, S. G. (2020). Incorporating the Insurance Value of Peri-Urban Ecosystem Services Into Natural Hazard Policies and Insurance Products: Insights From Mexico. Ecological Economics, 169, 106510. https://doi.org/10.1016/j.ecolecon.2019.106510 DOI: https://doi.org/10.1016/j.ecolecon.2019.106510

Deshmukh, G. K., Mukerjee, H. S., & Prasad, U. D. (2020). Risk Management in Global CRM IT Projects. Business Perspectives and Research, 8(2), 156–172. https://doi.org/10.1177/2278533719887005 DOI: https://doi.org/10.1177/2278533719887005

Drozdov, N. A., Kuzina, E. L., Vasilenko, M. A., Tagiltseva, J. A., Skichko, E. M., & Mushegyan, A. (2022). Planning and Estimation of Organizational and Technical Measures in Transport Companies. https://doi.org/10.15405/epsbs.2022.11.28 DOI: https://doi.org/10.15405/epsbs.2022.11.28

Enyinda, C. I. (2017). Modeling Enterprise Risk Management in Operations and Supply Chain: A Pharmaceutical Firm Context. Operations and Supply Chain Management an International Journal, 1–12. https://doi.org/10.31387/oscm0300195 DOI: https://doi.org/10.31387/oscm0300195

Fredericks, B., Bradfield, A., McAvoy, S., Ward, J., Spierings, S., Combo, T., & Toth‐Peter, A. (2023). Responding to COVID‐19: How Group Model Building Can Assist the Health and Well‐being of Urban Indigenous Communities in Australia. Australian Journal of Social Issues, 59(2), 462–486. https://doi.org/10.1002/ajs4.303 DOI: https://doi.org/10.1002/ajs4.303

Gamal, M., Helal, I. M. A., Mazen, S. A., & Elhennawy, S. (2021). IS Risks Governance for Cloud Computing Service. 67–79. https://doi.org/10.1007/978-981-16-2275-5_4 DOI: https://doi.org/10.1007/978-981-16-2275-5_4

Garbolino, E., Chéry, J.-P., & Guarnieri, F. (2016). A Simplified Approach to Risk Assessment Based on System Dynamics: An Industrial Case Study. Risk Analysis, 36(1), 16–29. https://doi.org/10.1111/risa.12534 DOI: https://doi.org/10.1111/risa.12534

Giaccone, S. C., & Magnusson, M. (2021). Unveiling the Role of Risk‐taking in Innovation: Antecedents and Effects. R and D Management, 52(1), 93–107. https://doi.org/10.1111/radm.12477 DOI: https://doi.org/10.1111/radm.12477

Handayani, W., & Rabihah, S. E. (2022). Risk Mitigation in Supply Chain Management Process: Procurement Using House of Risk Method at PT. Pertamina EP Asset 4. Jurnal Siasat Bisnis, 26(1), 70–84. https://doi.org/10.20885/jsb.vol26.iss1.art5 DOI: https://doi.org/10.20885/jsb.vol26.iss1.art5

Hou, Y., Such, J. M., & Rashid, A. (2019). Understanding Security Requirements for Industrial Control System Supply Chains. https://doi.org/10.1109/sescps.2019.00016 DOI: https://doi.org/10.1109/SEsCPS.2019.00016

Imran, F., Shahzad, K., Butt, A., & Kantola, J. (2021). Digital Transformation of Industrial Organizations: Toward an Integrated Framework. Journal of Change Management, 21(4), 451–479. https://doi.org/10.1080/14697017.2021.1929406 DOI: https://doi.org/10.1080/14697017.2021.1929406

Jin, Z., Gambatese, J., Liu, D., & Dharmapalan, V. (2019). Using 4D BIM to Assess Construction Risks During the Design Phase. Engineering Construction & Architectural Management, 26(11), 2637–2654. https://doi.org/10.1108/ecam-09-2018-0379 DOI: https://doi.org/10.1108/ECAM-09-2018-0379

Jones, K., Morga, M., Wanigarathna, N., Pascale, F., & Meslem, A. (2021). Improving the Resilience of Existing Built Assets to Earthquake Induced Liquefaction Disaster Events. Bulletin of Earthquake Engineering, 19(10), 4145–4169. https://doi.org/10.1007/s10518-020-00979-w DOI: https://doi.org/10.1007/s10518-020-00979-w

Likita, A. J., Jelodar, M. B., Vishnupriya, V., & Rotimi, J. O. B. (2023). Lean and BIM Integration Benefits Construction Management Practices in New Zealand. Construction Innovation, 24(1), 106–133. https://doi.org/10.1108/ci-06-2022-0136 DOI: https://doi.org/10.1108/CI-06-2022-0136

Macrae, C. (2021). Learning From the Failure of Autonomous and Intelligent Systems: Accidents, Safety, and Sociotechnical Sources of Risk. Risk Analysis, 42(9), 1999–2025. https://doi.org/10.1111/risa.13850 DOI: https://doi.org/10.1111/risa.13850

Makambajeki, R. P., & Mjema, E. A. M. (2023). Assessment of the Effectiveness of Risk Management Practices in the Performance of IT Projects. European Journal of Theoretical and Applied Sciences, 1(4), 1023–1030. https://doi.org/10.59324/ejtas.2023.1(4).97 DOI: https://doi.org/10.59324/ejtas.2023.1(4).97

Malamas, V., Chantzis, F., Dasaklis, T. K., Stergiopoulos, G., Kotzanikolaou, P., & Douligeris, C. (2021). Risk Assessment Methodologies for the Internet of Medical Things: A Survey and Comparative Appraisal. Ieee Access, 9, 40049–40075. https://doi.org/10.1109/access.2021.3064682 DOI: https://doi.org/10.1109/ACCESS.2021.3064682

Melanson, A., & Nadeau, S. (2019). Resilience Engineering for Sustainable Prevention in the Manufacturing Sector: A Comparative Study of Two Methods of Risk Analysis. American Journal of Industrial and Business Management, 09(01), 267–281. https://doi.org/10.4236/ajibm.2019.91017 DOI: https://doi.org/10.4236/ajibm.2019.91017

Mulyati, H., & Geldermann, J. (2016). Managing Risks in the Indonesian Seaweed Supply Chain. Clean Technologies and Environmental Policy, 19(1), 175–189. https://doi.org/10.1007/s10098-016-1219-7 DOI: https://doi.org/10.1007/s10098-016-1219-7

Oliva, F. L., Bution, J. L., Motta, F. G., Fenner, G., Randolph-Seng, B., Papa, M., & Naqshbandi, M. M. (2024). Appetite for Risk: Theoretical Framework and Practical Application in a Technology-Based Environment. Journal of Intellectual Capital, 26(1), 71–103. https://doi.org/10.1108/jic-04-2024-0108 DOI: https://doi.org/10.1108/JIC-04-2024-0108

Oliveira, F. R. N. (2024). Integrating the Failure Mode Analysis Tool and Effect on Risk Reduction Into an APQP Management Process in a Medium-Sized Company in the National Automotive Sector. International Journal of Management Research and Economics, 4(1), 27–36. https://doi.org/10.51483/ijmre.4.1.2024.27-36 DOI: https://doi.org/10.51483/IJMRE.4.1.2024.27-36

Olumide, S. (2023). Role of Risk Assessment and Mitigation in Strategic Planning in Nigeria. Ijsm, 2(2), 23–32. https://doi.org/10.47604/ijsm.2186 DOI: https://doi.org/10.47604/ijsm.2186

P. T. R. S. Sugathadasa, Wakkumbura, D., Perera, H. N., & Thibbotuwawa, A. (2021). Analysis of Risk Factors for Temperature-Controlled Warehouses. Operations and Supply Chain Management an International Journal, 320–337. https://doi.org/10.31387/oscm0460305 DOI: https://doi.org/10.31387/oscm0460305

Pamungkas, A., Larasati, K. D., Zakina, N., & Iranata, D. (2024). Risk Reduction Through Spatial Plan: A Case Study From Surabaya, Indonesia. Iop Conference Series Earth and Environmental Science, 1353(1), 012001. https://doi.org/10.1088/1755-1315/1353/1/012001 DOI: https://doi.org/10.1088/1755-1315/1353/1/012001

Papastergiou, S., & Polemi, N. (2017). MITIGATE: A Dynamic Supply Chain Cyber Risk Assessment Methodology. 1–9. https://doi.org/10.1007/978-981-10-6916-1_1 DOI: https://doi.org/10.1007/978-981-10-6916-1_1

Putra, Z., Chan, S., & Iha, M. (2017). Design of Risk Management Based on Iso 31000 in PDAM Tirta Meulaboh. Afebi Management and Business Review, 2(01), 21. https://doi.org/10.47312/ambr.v2i01.55 DOI: https://doi.org/10.47312/ambr.v2i01.55

Putri, G. N., & Ariesyadi, H. D. (2023). Analysis of Occupational Safety and Health (K3) Risk Management in Construction Industry (Case Study: Construction of Natural Gas Transmission Pipelines). Devotion Journal of Research and Community Service, 4(9), 1895–1907. https://doi.org/10.59188/devotion.v4i9.565 DOI: https://doi.org/10.59188/devotion.v4i9.565

Roccati, A., Paliaga, G., Luino, F., Faccini, F., & Turconi, L. (2021). GIS-Based Landslide Susceptibility Mapping for Land Use Planning and Risk Assessment. Land, 10(2), 162. https://doi.org/10.3390/land10020162 DOI: https://doi.org/10.3390/land10020162

Sari, Y., & Setyaningrum, D. (2022). Risk Management in Public Educational Institution (Case Study at XYZ Education and Training Center). https://doi.org/10.4108/eai.10-8-2022.2320878 DOI: https://doi.org/10.4108/eai.10-8-2022.2320878

Senna, P., Reis, A. d. C., Santos, I. L. d., & Dias, A. C. (2022). Healthcare Supply Chain Risk Management in Rio De Janeiro, Brazil: What Is the Current Situation? Work, 72(2), 511–527. https://doi.org/10.3233/wor-205216 DOI: https://doi.org/10.3233/WOR-205216

Shao, W., Feng, K., & Lin, N. (2019). Predicting Support for Flood Mitigation Based on Flood Insurance Purchase Behavior. Environmental Research Letters, 14(5), 054014. https://doi.org/10.1088/1748-9326/ab195a DOI: https://doi.org/10.1088/1748-9326/ab195a

Tan, S., Weinert, D., Joseph, P., & Moinuddin, K. (2021). Sensitivity and Uncertainty Analyses of Human and Organizational Risks in Fire Safety Systems for High-Rise Residential Buildings With Probabilistic T-H-O-Risk Methodology. Applied Sciences, 11(6), 2590. https://doi.org/10.3390/app11062590 DOI: https://doi.org/10.3390/app11062590

Tan, S.-M., Liew, T. W., & Gan, C. L. (2020). Motivational Virtual Agent in E-Learning: The Roles of Regulatory Focus and Message Framing. Information and Learning Sciences, 121(1/2), 37–51. https://doi.org/10.1108/ils-09-2019-0088 DOI: https://doi.org/10.1108/ILS-09-2019-0088

Tretiakova, L., Mitiuk, L., Ilchuk, O. S., & Rebuel, E. (2022). A Management Decision-Making Algorithm for Planning Activities to Reduce the Production Risk Level. Labour Protection Problems in Ukraine, 38(3–4), 3–10. https://doi.org/10.36804/nndipbop.38-3-4.2022.3-10 DOI: https://doi.org/10.36804/nndipbop.38-3-4.2022.3-10

Turgay, S., Er, E., & Kazancı, S. (2023). Navigating Uncertainty: A Comprehensive Approach to Risk Management in R&D Projects With the Gravity Search Algorithm Based McDm. Industrial Engineering and Innovation Management, 6(10). https://doi.org/10.23977/ieim.2023.061013 DOI: https://doi.org/10.23977/ieim.2023.061013

Wang, F., Ding, L., Love, P. E., & Edwards, D. J. (2016). Modeling Tunnel Construction Risk Dynamics: Addressing the Production Versus Protection Problem. Safety Science, 87, 101–115. https://doi.org/10.1016/j.ssci.2016.01.014 DOI: https://doi.org/10.1016/j.ssci.2016.01.014

Winter, P., Downer, J., Wilson, J., Abeywickrama, D. B., Lee, S., Hauert, S., & Windsor, S. P. (2024). Applying the “SOTEC” Framework of Sociotechnical Risk Analysis to the Development of an Autonomous Robot Swarm for a Public Cloakroom. Risk Analysis, 45(4), 878–895. https://doi.org/10.1111/risa.17632 DOI: https://doi.org/10.1111/risa.17632

Downloads

Published

2025-04-30

How to Cite

Mubarok, A., & Yuda, F. Z. A. (2025). Building Resilience in High Technology Projects: An Integrated Multi Framework Risk Management Approach. Novatio : Journal of Management Technology and Innovation , 3(2), 93–106. https://doi.org/10.61978/novatio.v3i2.860

Issue

Section

Articles