Rizani, M. D. and Wibowo, S. (2026) “BIM Maturity and Its Indirect Effects on Cost and Schedule Performance in High-Rise Construction: A PLS-SEM Analysis of Clash Detection and Rework Mechanisms”, Konstruksia : Journal of Construction, Structures and Infrastructure, 1(1), pp. 8–15. Available at: https://journal.idscipub.com/index.php/konstruksia/article/view/1563 (Accessed: 24 June 2026).