Rizani, M. D., & Wibowo, S. (2026). BIM Maturity and Its Indirect Effects on Cost and Schedule Performance in High-Rise Construction: A PLS-SEM Analysis of Clash Detection and Rework Mechanisms. Konstruksia : Journal of Construction, Structures and Infrastructure, 1(1), 8–15. Retrieved from https://journal.idscipub.com/index.php/konstruksia/article/view/1563