[1]
Rizani, M.D. and Wibowo, S. 2026. BIM Maturity and Its Indirect Effects on Cost and Schedule Performance in High-Rise Construction: A PLS-SEM Analysis of Clash Detection and Rework Mechanisms. Konstruksia : Journal of Construction, Structures and Infrastructure. 1, 1 (Jun. 2026), 8–15.